ferroli tempra 12 manual

1 post / 0 new
xnnrjit
Картинка користувача xnnrjit.
ferroli tempra 12 manual

ferroli tempra 12 manual

LINK 1 ENTER SITE >>> Download PDF
LINK 2 ENTER SITE >>> Download PDF

File Name:ferroli tempra 12 manual.pdf
Size: 3735 KB
Type: PDF, ePub, eBook

Category: Book
Uploaded: 30 May 2019, 19:44 PM
Rating: 4.6/5 from 820 votes.

Status: AVAILABLE

Last checked: 5 Minutes ago!

In order to read or download ferroli tempra 12 manual ebook, you need to create a FREE account.

Download Now!

eBook includes PDF, ePub and Kindle version

✔ Register a free 1 month Trial Account.

✔ Download as many books as you like (Personal use)

✔ Cancel the membership at any time if not satisfied.

✔ Join Over 80000 Happy Readers

ferroli tempra 12 manualCHARACTERISTICS AN Page 36 and 37: Tempra 12 - 184.3 Hydraulic diagram Page 38 and 39: Tempra 12 - 184.5 DiagramsPressure Page 40 and 41: BENCHMARKCOLLECTIVE MARKBENCHMARK N Page 44: Should you require help during inst Thank you, for helping us keep this platform clean. The editors will have a look at it as soon as possible. Such provisions specified in the corresponding European must be strictly adhered to so as directives. The boiler can be connected to an external hot water cylinder for the production of domestic hot water. This is only for use with optional water control kit. With the knob “B” Fig. 1 in the position of. For correct operation and long-life of the boiler, the hydraulic system must be suitably proportioned and always fitted with all the accessories that guarantee regular operation. For further information contact: VESSEL CHARGE PRESSURE (bar) Fernox Manufacturing Co. The electrical safety of the appliance is ensured only when the appliance is correctly connected to an effective earth system, as prescribed by the safety standards in force. Before inserting the flue gas outlet pipe, check that the correct restrictor is installed (when this needs to be used) and correctly positioned. Numerous accessories are available upon request for the various different installation requirements. Secure it in place with the four screws removed previously. Numerous accessories are available upon request for the various different installation requirements. Connect a suitable pressure gauge to the pressure test point B located on the gas valve; turn the temperature control knob to the maximum value, then adjust the pressure to the value required, using the pressure-output diagram in the chapter on technical specifications. Is LED2 on Does sparking start without at burner.Go to chart 4 Re-check air pressure switch Check and if necessary. GAS BOILER COMMISSIONING CHECKLIST C O L L E C T I V E M A R K BOILER SERIAL No. CORGI ID CARD SERIAL No. With the knob “B” Fig.http://denetimmusavirlik.com/userfiles/epson-stylus-photo-r1900-manual.xml

    Tags:
  • ferroli tempra 12 manual, ferroli tempra 12 manual transfer switch, ferroli tempra 12 manual transmission, ferroli tempra 12 manual pdf, ferroli tempra 12 manual briggs and stratton.

1 in the position of. For correct operation and long-life of the boiler, the hydraulic system must be suitably proportioned and always fitted with all the accessories that guarantee regular operation. For further information contact: VESSEL CHARGE PRESSURE (bar) Fernox Manufacturing Co. The electrical safety of the appliance is ensured only when the appliance is correctly connected to an effective earth system, as prescribed by the safety standards in force. Before inserting the flue gas outlet pipe, check that the correct restrictor is installed (when this needs to be used) and correctly positioned. Numerous accessories are available upon request for the various different installation requirements. Secure it in place with the four screws removed previously. Numerous accessories are available upon request for the various different installation requirements. Supplied By www.heating spares.co Tel. 0161 620 6677. Connect a suitable pressure gauge to the pressure test point B located on the gas valve; turn the temperature control knob to the maximum value, then adjust the pressure to the value required, using the pressure-output diagram in the chapter on technical specifications. The control unit will be reset and will repeat the ignition cycle. If, after a number of attempts, the burners do not ignite, refer to the paragraph “Troubleshooting”. Is LED2 on Does sparking start without at burner.Go to chart 4 Re-check air pressure switch Check and if necessary. Just click on the model or the Gas council number and the manual will download at the bottom of the page. After you have downloaded the manual double click on the download for the manual to open, if you want to save the download right click. If you continue without changing your settings, we'll assume that you are happy to receive all cookies on the website. However, you can read our Cookie Policy here. Accept and Continue.http://www.marcth.pl/media/fck/epson-stylus-photo-r1800-printer-manual.xml Scroll down to find the manual you want or use the search bar to search by the boiler name or gas council number. Gas101 is still under construction, and we are continuously updating our collection of boiler manuals. You can help by CLICKING HERE if you notice any errors or missing manuals. We have spent many hours sourcing these manuals and adding the gas council numbers to each one and would really appreciate any feedback you might have. Regrettably, our offices will be also be closed today and phones will not be manned.Stay warm with a high performance, energy efficient Ferroli boiler. System Boiler,You can check with the CORGI registeredThis symbol indicates “Warning”This symbol highlights a note orCertification. The CE Mark attests that Ferroli gas-firedIn particular, this appliance conforms toDear Customer. Thank you for having chosen the SYS 10-23, an advanced-concept FERROLI wall-hung boilerPlease carefully readThe SYS 10-23 is a high efficiency heat generator for central heating systems, operating onThe boiler can be connected to an external hot water cylinder for the production of domesticThe boiler body is made up of a copper heat exchanger, the special shape of which guaranteesThe boiler is completely sealed from the surrounding environment: the air required for combustionThe accessories supplied withThe user simply has to set the temperature required inside the home (using the optional, yetThe regulation and control system will then ensureTo access the control panel, open the drop down cover.Rseset knob with lamp.https://www.location-guide-saarland.de/fr/inhalt/dinamap-1846sx-service-manual Central heating pressure gaugeIgnitionIf after completing the start-up procedure correctly, the burner fails to ignite and the boiler shutThe reset electronicIf after a second attempt the burners still fail to ignite,If there is a power failure while the boiler is in operation, the burners automatically go outIf the system is filled with very cold water, the boiler will automatically light due to theThe boiler will not shut down, until the water. Shut-down. Close the gas isolation valve upstream of the boiler, push the button “A” to OFF and disconnectWhen the boiler power is off the boiler anti-freeze protection is not active. For extended periods of inactivity during the winter months, and in order to avoid damageSetting the ambient temperature (using the optional room thermostat). Set, using the room thermostat, the temperature required inside the rooms. Based on the commandWhen the required temperature inside the rooms is reached, theSystem water pressure control. Manually filling the central heating system with external connection and cock. The filling pressure whenUser must restore the initial value using the filling loop. Once the operation is completed, always closeIt is recommended to have annual service of the appliance performed by qualified personnel. PleaseThe casing, the control panel and the aesthetic parts of the boiler can be cleaned using a soft and dampDo not use abrasive detergents or solvents.This appliance must only be used for the purposes it has been specifically designed for. This appliance isAll other uses are considered improper.The manufacturer will notThis appliance must be installed strictly in accordance with these instructions. The Local Building Regulations. The Building Regulations. The Buildings Standards (Scotland - Consolidated) Regulations. British gas publication DM2 - Guide for installation in timber framed housing. British Standards Codes of Practice:Part 2For Northern Ireland the rules in force applyThe appliance’s combustion chamber is sealed from the surrounding environment and as a result theThe installation environmentThe place of installation must in any case be free of dust, inflammable objects or materials and corrosiveThe boiler is supplied ready for wall-hung installation. The rear frame of the appliance has a series ofThe fastening to the wall must provideThe boiler must be fastened to a closed part of wall, which is free of apertures or holes behind the frameIf the appliance is enclosed in a cabinet or alongside another appliance, space must be allowedRecommendedFixing to the wall. Select suitable mounting position for boiler, using the template mark flue outlet and boiler mountingFit two special wallMount the boiler on the wall bracketUsing a coreThe heat capacity of the appliance should be established in advance by calculating the heatingFor correct operation and long-lifeIn the case where the central heating outlet and inlet pipes follow paths whereby, at some points,In addition, a drain device should be installed at the lowest point in the system, to allowIf the boiler is installed at a lower level than the system, a flow-return valve should be fitted to preventThe temperature differential between the outlet and the inletBefore installation, carefully clean all the pipes in the system toMake the connections to the corresponding fittings, asKeyIt is recommended to fit isolation valves between the boiler and the central heating system; these allowThe discharge of any safety valves must be routed to outside dicharging to ground levelThe manufacturerMake the connections to the boiler in a way that its internal tubing is not subject to stress.Provision must be made for replacing water lost from the sealed system. Reference should be madeThe use of mains water toThe supplied temporary filling loop is shown in fig.Attention - is drawn to the Model Water Byelaws. Fittings manufactured from duplex (alpha-beta) brass are not acceptable for underground use andKeyFig. 5. Water treatmentFernox Manufacturing Co. LTD. Tandern house, Marlowe Way. Croydon, surrey, CRO 4YS. Tel. 02870 5601 5000. Sentinel Division. Betz Dearborn LTD. Widnes, Cheshire WA8 5351. Tel. 0151 424 5351. Note - If the boiler is installed in an existing system any unsuitable additives must be removedAll systems should be cleansed according to B.S. 7593. Note - In hard water areas treatment to prevent lime scale may be necessary. Note - It is important that the correct concentration of the water treatment product is maintained inFilling the boiler and the system. The filling pressure, when the system is cold, must be around 1 bar (at least 0.5 bar). If the pressureFor correct boiler operation, the pressure, when hot, mustThis deviceBefore making the connections, check that the appliance is configured for operation with theThe gas connections must be made using the relative coupling (see fig. 4), according to the standards inCheck that all the gas connections for soudness. The capacity of the gas meter must be sufficient for the simultaneous use of all the connected appliances. The diameter of the gas pipe, which leaves the boiler, does not necessarily determine the choice of theDo not use the gas pipes as the earth for electrical appliances.Connection to the mains power supply. The boiler should be connected to a single-phase, 230 Volt-50 Hz electrical line. The electrical safety of the appliance is ensured only when the appliance is correctly connectedHave professionallyThe manufacturerIn addition,The boiler is pre-wired and fitted with a cable for connection to the electrical line. The connectionsMax 3A fuses must be installed between the boiler and theThe appliance’s power cable must not be replaced by the user. In the event where the cable isIf replacing the electrical power cable. All wiring must conform to current I.E.E. Regulations. Accessing the electrical terminal block. Follow the operation shown in Figs. 6a and 6b to access the electrical terminal block. The layoutTechnical Specifications. Fig. 6a. Fig. 6bFor a general pipe layout and wiring diagram on the “S” and “Y” plan systems please seeSYS “S” Plan. Pipe layoutAutomaticFig. 7a. Wiring diagram. SYS 10-23 Junction BoxTerminal 7 - SWITCH LINECylinder ThermostatAuto air ventWiring diagram. SYS 10-23 Junction BoxThe heating system must have an automaticTerminal 7 - SWITCH LINEThis is a “type C” sealed and forced draught appliance, and as such the air inlet and flue gasThe standards in force and local legislation mustRestrictors. For the operation of the boiler, the restrictors supplied with the appliance must be fitted, according toChoice of the restrictors usingTable 4b. Table 4a. Type. Choice of the restrictors using 2Length up to. Restrictor to be usedNo restrictorNo restrictor. Total calculatedUse restrictorMinimum. MaximumNo restrictor. Replacing the restrictor. To install or change the restrictor, remove theN.B.: the diameter ofNumerous accessories arePlease refer to the flueSide Outlet. Front viewRight hand. Cut the internal pipeLeft hand. Top view. Drill the wall 10, 20 mmVerticalVertical outletMax. 4m extensionNumerous accessories are available upon request for the variousThe most frequently-used components are shown in Tables 7 - 8 - 9. Please refer to the flue accessories catalogue or the price list for other components. To check that the maximum allowed length of the pipes is not exceeded, a simple calculationThis drop is called “equivalent air-metres” as it relates to the pressure drop of one metre of air intakeIf the flue system chosen exceeds maximum allowable limit, some sections of the pipesTable 6. Ref. EquivalenteDescriptionAir wall terminal outlet flueTotalMale-femaleOutlet flue air inletMale-femaleDescription. Horizontal. Vertical. Table 7. Air terminal Air wall terminalMale-femaleMale-female Female-female Female-female Male-female. Table 8. Description. AirHorizontal. Reduction. Flue. Air. Spigot andAirwall terminal. Spigot and socket Condensate flueReduction. FlueMinimum Dimensions of Flue Terminal Positions. Aa. Ba. Ca. Directly below an opening, air brick,Above an opening, air brick,Horizontally to an opening, air brick,Separation distancesCondensing Terminal Positions: If the flue is to be terminated at low level, then theThe plume should not be directed:All the adjustment and conversion operations must be performed by Qualified Personnel, such asConversion of supply gas. The appliance can operate on Natural Gas or LPG as the supply gas, and is factory configured forChap. 4.4, according to the type of gas usedAdjusting the gas pressure and heat outputTest PointTo adjust boiler heat input simply adjust the burner pressure gas via the pressure regulator onAdjust the gas pressure at the burner by turning the pressureThe diagrams indicate the variation in heat output to theAdjusting boiler output to the actual requirements ofPressure regulatorInletTest Point. InletThe appliance must only be commissioned for use by Qualified Personnel. Before igniting the boiler:Igniting the boiler. Open the gas isolation valve upstream of the boiler. Vent the air in the pipe upstream from the gas valve. Close any switches or insert any plugs upstream of the boiler. Place the main switch in the ON position.At this point, the burner will ignite and the boiler will startThe control unit will be reset and will repeat the ignition cycle. If, after a numberIn the case of power failures while the boiler is in operation, the burners will switch off. WhenChecks during operation. Check the gas supply and the water system for tightness. Check the efficiency of the flues and air-flue gas pipes during the operation of the boiler. Check that the water circulation between the boiler and the systems is correct. Ensure that the gas valve modulates correctly both in the central heating phase and theShut-down. Close the gas isolation valve upstream of the boiler and disconnect the appliance from theFor extended periods of inactivity during the winter months, in order to avoid damage due toThe following operations must only be performed by Qualified Personnel. SeasonalThe following checks should be made on the appliance at least once a year:The pipes and the air-flue gas terminals must be free of obstacles and not have any leaks. The water systems must be perfectly tight and the gas supply sound. The burner and the heat exchanger must be clean. Follow the instructions in the next paragraph. The electrodes must be free of deposits and positioned correctly. The pressure of the water in the system when cold must be around 1 bar; if not, restore this value. The expansion vessel must be full. The gas rate and the pressure must correspond to the values indicated in the corresponding tables. The circulation pumps must not be blocked.To open the boiler casing:Cleaning the boiler and the burner. The body and the burner must not be cleaned using chemical products or steel brushes. Special careSpecial attention must also be paid,After these checks, ensure that there are no gas leaks. Analysis of combustion. Two test points are installed inside the boiler, one for the flue gases and the other for the intake air. To make the measurements, proceed as follows:FlueTesting before thermal equilibrium has been reached will give incorrect readings.Initial procedureThe cold water mainsThe C.H. flow and return cocks are turned off at the isolation cocks. The C.H. is drained via theFinal procedure. Re-charge to 1 bar if necessary. I) Gas soundness of all joints. II) Water soundness of all joints. III) The electricity supply. IV) The pressure of the sealed system and top up where necessary. To lower the control panelRemove and re-presurising of C.H. expansion vessel. Refer to 7.01 a, b. Isolate electricity and water supplies. Remove outer case (two screws bottom rear corners). Remove the expansion vessel. Re-assemble in reverse order. Re-pressure expansion vesselFig. 19Valve. Fig. 21Isolate gas and electricity supplies. Remove room sealed coverRemoval of fan (fig. 23). Isolate gas and electricity supplies. Remove room sealed cover. Remove fan from boiler. Limit thermostat, or overheat cut off thermostat (fig. 23). Isolate electricity. Identify the location of thermostat from. Pull out thermostat from tube, with its spring. Remove electrical connections from thermostat. Remove spring from thermostat. Replace in reverse order. Overheat cut offIsolate gas and electricity supply. Open room sealed compartment and combustion chamber. Identify electrode from fig. 24. Remove fixing screw and remove flame detect electrode. Remove the two fixing screw from spark electrode plate and remove it. Flame detect. SparkPump. Replacement of pump headRemoval of heat exchanger. Isolate gas, water and electricity supplies. Remove casing (2 screws bottom corners). Remove the two securing screws and lower control panel. Remove sealed compartment front panel. Disconnect the overheat thermostat and central heating limit thermostat. Remove the main burner, fan, flue hood and flow meter as described previously. Remove the pump to heat exchanger flow connection and locknut. Undo the domestic water outlet connection and locknut. Lift out heat exchanger. Re-assemble in reverse orderKeyGas inlet. Central heating flow. Central heating return. Safety valve. Fan. Combustion chamber. Burner assembly. Main injector. Burner. Combustion chamber insulation. Copper heat exchanger. Flue collector from heatInternal flue exit. Central heating pump. Automatic air vent valve. Air pressure switch. Gas valve. Safety overheat thermostat. Central heating flow limitCentral heating frost thermostat. Expansion vessel. CH boiler thermostat. Ignition electrode. Sensor electrode. Reset knob with lamp. Pump overrun thermostat. Central heating pressure gauge. Flue restrictorKeyGas inlet. Internal flue exit. Central heating pumpGas valve. Central heating flow limit thermostat. Flue restrictorOutput. Nominal Heat Input (Net). Nominal Heat OutputGas supply. Main injectors, Natural Gas (G20)Supply pressure, Natural Gas (G20)Burner pressure, Natural Gas (G20)Natural gas rate (G20). Main injectors, LPG (G31)Pmax. PminPminSupply pressure, LPG (G31)Burner pressure, LPG (G31)Expansion vessel capacity. Expansion vessel pre-fill pressure. Hot water capacityWeight with packagingSystem filling fittingsCentral heating system fittingsPower supply. Max Power Absorbed. Index of protectionPressure - output diagramsDischarge head available to systemInstaller. Service EngineerCustomer Service Helpline. Lich?eld Road, Branston Industrial Estate, Burton Upon Trent, Staffordshire DE14 3HD. Tel. 08707 282 885 - Fax 08707 282 886. You can check with the CORGI registeredThis symbol indicates “Warning”This symbol highlights a note or anCertification. The CE Mark attests that Ferroli gas-firedIn particular, this appliance conforms toTempra 12 - 18Benchmark.40Dear Customer,Please carefully readThe boiler can be connected to an external hot water cylinder for the production of domesticThe boiler body is made up of a copper heat exchanger, the special shape of which guaranteesThe boiler is completely sealed from the surrounding environment: the air required for combustionThe accessories supplied withThe microprocessor-based control system means that the operation of the appliance is almost completelyThe user simply has to set the temperature required inside the home (using the optional, yetThe regulation and control system will then ensureTo access the control panel, open the drop down cover.Burner on signalLock-out warning signalStand-by in central heating operation (light flashing). Central heating request (light on)Mains power (light on)Ignition. Ensure 230V supply is present at the boiler. Place the main switch “A” in the ON position. Place knob “B” in the Winter position and set the room thermostat, if fitted, to the requiredIf, after having correctly performed the ignition operations, the burners do not ignite and theIf, after a numberShut-down. Close the gas isolation valve upstream of the boiler, turn knob “A” to OFF and disconnect theWhen the boiler power is off the boiler anti-freeze protection is not active. For extended periods of inactivity during the winter months, and in order to avoid damage dueWith knob “B” Fig. 1 in the position of the symbolWith the knob “B” Fig. 1 in the position ofTurning the knob clockwise increases the central heatingSetting the ambient temperature (using the optional room thermostat). Set, using the room thermostat or remote control, the temperature required inside the rooms. BasedWhen the required temperature inside the rooms is reached, theDomestic hot water temperature control. Set the hot water cylinder temperature, using knob “D” (supplied in the optional kit). System water pressure control. Once the operation is completed, always closeIt is recommended to have annual service of the appliance performed by qualified personnel. PleaseThe casing, the control panel and the aesthetic parts of the boiler can be cleaned using a soft and dampDo not use abrasive detergents or solvents.Any anomalies or operating faults are signalled by the LEDs on the control panel. The following table listsTable 2Solution. Boiler locked-out. Check if the gas isolation valve upstream of the boiler and on the counter are open. Turn knob “A” Fig. 1 to “Reset” and then release it. In the event of repeated boiler lock-out, contact the nearest service centre. Before calling the service centre, check that the problem is not due to no gas or mains powerThis appliance must only be used for the purposes it has been specifically designed for. The rear frame of the appliance has a series ofThe fastening to the wall must provideThe boiler must be fastened to a closed part of wall, which is free of apertures or holes behind the frameIf the appliance is enclosed in a cabinet or alongside another appliance, space must be allowedRecommendedSelect suitable position for boiler, using the template markDrill two 10 mm holesFix the wall bracket toSelect suitable position for boiler, using the plate inserted inFollow procedure in 2.6 for boiler transformation and mounting.Tempra 12 - 18The heat capacity of the appliance should be established in advance by calculating the heatingFor correct operation and long-lifeIn the case where the central heating outlet and inlet pipes follow paths whereby, at some points,In addition, a drain device should be installed at the lowest point in the system, to allowIf the boiler is installed at a lower level than the system, a flow-return valve should be fitted to preventDo not use the water pipes as the earth for electrical appliances. Before installation, carefully clean all the pipes in the system to remove any residues or impurities thatMake the connections to the corresponding fittings, as shown in Fig. 5.It is recommended to fit isolation valves between the boiler and the central heating system; these allowThe discharge of any safety valves must be routed to outside dicharging to ground level 100 mmThe manufacturer of the boiler willMake the connections to the boiler in a way that its internal tubing is not subject to stress.Water treatmentFernox Manufacturing Co. LTD. Note - If the boiler is installed in an existing systemAll systems should be cleansed according to B.S.EXPANSION VESSEL VOLUME (litres). LitresFilling the boiler and the system. The filling pressure, when the system is cold, must be around 1 bar (at least 0.5 bar). If the pressureFor correct boiler operation, the pressure, when hot, mustThis deviceBefore making the connections, check that the appliance is configured for operation with theThe gas connections must be made using the relative coupling (see Fig. 5), according to the standards inCheck that all the gas connections for soudness. In the event where the cable isAll wiring must conform to current I.E.E. Regulations. Fig. 6b. Room thermostatFor a general pipe layout and wiring diagram on the “S” and “Y” plan systems please seePipe layoutTo ensure a passage of 6ltrsFig. 6c. Wiring diagramTerminal 8 - SWITCH LINECylinder ThermostatTempra 12 - 18. Pipe layout. Auto air ventApril 2001)Fig. 6e. Wiring diagramThe heating system must have a bypass capable ofTerminal 8 - SWITCH LINEFig. 6fThis is a “type C” sealed and forced draught appliance, and as such the air inlet and flue gasThe standards in force and local legislation mustRestrictors. For the operation of the boiler, the restrictors supplied with the appliance must be fitted, according toChoice of the restrictors usingChoice of the restrictors using 2Table 4b. Length up to. Tempra 12. Tempra 18Total calculatedRestrictor to be usedReplacing the restrictor. Min. MaxUse restrictor. Tempra TempraTo install or change the restrictor, remove the fan unit,Before inserting the flue gas outlet pipe, checkTempra 12 - 18. Connection using concentric flueNumerous accessories are availablePlease refer to the flue accessoriesRear Outlet. Side Outlet. Front view. Left hand. Slope downwards. Drill the wall 10, 20 mmReduction factors for bendsMax. 4m extensionMaximum allowedVertical outletFor installation (back flue connection). For direct back flue connection it is necessaryFollow carefully next procedure:Remove fan by pulling off electrical connections. Pull off air pressure switch tubes from the airFig. 11aTake off the four screws which fix the back plate on sealed chamber, remove andFig. 11b. Fig. 11c. Fig. 11dSecure the fan to the plate in the new position usingFor rearFor upperCommon. For upper outlet. For rear outletFig. 11eFig. 11f. Fig. 11g. Fix with the screws (b). Refit wiring connections to fan and air pressure switch tubes ensuring correctFit the fan into the boiler rotating the front to engage with the pin a. Secure with the screws b.RearFig. 11hFig. 11l. Fig. 11iFix plate to wall with theCircular Gasket. Fig. 11m. Square Gasket. Fig. 11nM4 x 6mm long. Fig. 11oFig. 1pFig. 11g. Tempra 12 - 18. FlueConnection using two pipe system. The appliance may be connected to a systemPlease refer to the flue accessories catalogueTo check that the maximum allowed length ofAirThis drop is called “equivalent air-metres”If the flue system chosen exceeds maximum allowable limit, some sections ofRef.Description. Wind-protection terminal. T adaptorTotalCondensate flueMale-femaleAir terminal ofVertical. Male-female Male-female. Pipes and fittings reduction table. FlueTempra 12 - 18. Flue terminal positionsTab. 8. Minimum dimensions of flue terminal positions (alltypes)(see fig. 14). Dimensions. Terminal positionBalanced flues roomFannedIn addition, the terminal should not be nearer than 150 mm (fanned draucht) or 300 mm (natural draught) to an opening in the building fabricAll the adjustment and conversion operations must be performed by Qualified Personnel, such asConversion of supply gas. The appliance can operate on Natural Gas or LPG as the supply gas, and is factory configured forChap. 4.4, according to the type of gas usedAdjusting the burner pressure. This appliance, featuring flame modulation, has two set pressure values: the minimum and maximum,KeyPressure test point downstream. Protection screw. Minimum pressure adjustment screws. Maximum pressure adjustment screws. Pressure compensation pipeTempra 12 - 18. Adjustments on the electronic board. Follow the indications shown in the figure to access the electronic board.